We are ready for spring. 40 tons (and that's no joke) of rocks
are staged and ready for mud management.
Two loads of boulders and two loads of washed oversize.
The plan is to do away with a portion of (very, very soggy, muddy, swampy) lawn, create an area for a greenhouse, a fire pit, an herb garden and a dry creek bed to drain it all.
There will be french drains, shade trees, fruit trees shrubs and grasses.
It will be waiting for us when the snow melts away in spring.
And it looks like a lot of work.